Installation Engineers


Location: Stavanger ID: HQ00008203
Installation Engineers
 
Role A
- Responsible for planning of operations, writing procedures, presenting in HAZOP, procuring equipment and providing offshore support for the following scopes:
- Installation of 8 off long flying leads at Njord A from deck carousel over chute, 450-750m long
- Installation of 2 off ISU umbilicals (procedure updates and equipment follow-up)
- Relocation of existing wetstored riser
- Rerouting of 1 existing HFL
- Rerouting of 1 existing umbilical
- Installation of 1 AUV garage and related flying leads (TBC)
- Installation of 18 off electrical actuators (TBC)
- Ad-hoc work from client (TBC)
 
Role B
- Responsible for planning of operations, writing procedures, presenting in HAZOP, procuring equipment and providing offshore support for the following scopes:
- 2 off RTS tie-ins
- 8 off ROVCON tie-ins
- 1 off ROVCON disconnection & pull-back
- 4 off SeAlign tie-ins
- 2 off PLR removals
- GE riser disconnection from wetstorage frame and recovery
- Flexible ends Lift & Shifts for tie-in
- Supervision of Njord GE & Bauge Commissioning assistance following tie-ins; – pig tracking, cap removal, dye sticks, temp structure recovery, leak test visual obs, valve operations, flushing, pigging, leak testing. This work shall be performed by our precom engineering department/IKM, but this engineer from the project to ensure included in correct procedures and take ownership of it offshore.
 
Location:
Stavanger and Offshore